WIRELESS METERING NETWORK

Leave Your Message
WR-X Water Meter Pulse Reader
Data Logger

WR-X Water Meter Pulse Reader

WR-X Water Meter Pulse Reader enables traditional mechanical water meters to be upgraded for remote reading through LoRaWAN, NB-IoT, LTE Cat.1, or Cat-M1 communication. With wide meter compatibility, long battery life, and remote management capability, it provides a practical and cost-effective solution for smart water metering projects.

    The WR-X Water Meter Pulse Reader is a wireless retrofit device designed to upgrade mechanical water meters for remote reading. It collects pulse signals from compatible water meters and transmits data through LoRaWAN, NB-IoT, LTE Cat.1, or Cat-M1, helping utilities and system integrators build smart water metering systems without replacing existing meter bodies.

    With broad compatibility, long battery life, flexible communication options, and remote management capability, WR-X is suitable for residential, commercial, industrial, and smart city water metering projects.

    Key Features

    • Wireless retrofit solution for mechanical water meters
    • Compatible with multiple leading water meter brands
    • Adjustable bottom bracket for easier installation
    • Supports LoRaWAN, NB-IoT, LTE Cat.1, and Cat-M1
    • Replaceable Type C / Type D battery options
    • Battery life of over 10 years
    • Remote diagnostics and firmware upgrade support
    • Suitable for large-scale AMR / AMI water metering projects

    Applications

    • Residential water meter remote reading
    • Commercial and industrial water consumption monitoring
    • Mechanical water meter retrofit projects
    • AMR / AMI smart water metering systems
    • Smart city utility management
    • Utility digitalization projects

    Compatible Meter Brands

    WR-X is designed for compatibility with major water meter brands, including ZENNER, INSA/SENSUS, ELSTER, DIEHL, ITRON, BAYLAN, APATOR, IKOM, ACTARIS, and other compatible pulse-output water meters.

    Compatibility should be confirmed according to the specific meter model and installation structure before deployment.